Full Package Bathroom Renovation Hanoi – Cheap, Most Reputable 2026 ✅

Full Package Bathroom Renovation Hanoi

Bathroom renovation is a solution that transforms old, musty WC spaces into clean, modern, and more comfortable areas. This article by Duc Khoi provides detailed construction process guidelines, updated 2026 pricing, and the most beautiful design samples for homeowners’ reference. Let’s explore!

Nội dung bài viết

When Do You Need Bathroom Renovation?

Many families wonder whether they should renovate their bathroom or just do simple repairs. Below are signs that indicate you should do a complete renovation rather than temporary patching.

Khi nào cần cải tạo

Deteriorated Electrical and Plumbing Systems

Leaking water supply and drainage pipes that emit unpleasant odors are serious warning signals. Faulty electrical systems with corroded switches and outlets not only cause inconvenience but also pose fire and electrical shock hazards threatening family safety. When these problems appear, replacing the entire water supply, drainage, and electrical systems is necessary instead of just doing spot bathroom repairs.

Walls and Floors with Water Seepage and Mold

Cracked, peeling, or yellowed tiles are consequences of poor-quality bathroom waterproofing. Water-damaged walls with spreading water stains and developing black mold not only ruin aesthetics but also affect health. This is when you need a complete renovation package to thoroughly address the problem from its root, including re-waterproofing the entire foundation and walls.

Damaged or Outdated Sanitary Equipment

Toilets that frequently clog with ineffective flushing, cracked washbasins, rusty and weak-flowing shower heads make daily activities uncomfortable. Sanitary equipment that has been in use for 10-15 years typically wastes water, no longer ensures hygiene, and replacement parts are hard to find.

Inconvenient Design Not Suitable for Current Needs

Small cramped spaces lacking natural light make bathrooms perpetually damp and stuffy. Many families want to separate dry and wet zones for more convenient use, or adjust door positions to align with bathroom feng shui principles.

5+ Important Notes You MUST KNOW Before Bathroom Renovation

For the bathroom construction process to proceed smoothly and achieve long-lasting quality, you need to understand these important notes before starting work.

Lưu ý quan trọng

Waterproofing

The bathroom waterproofing layer determines 70% of the project’s lifespan. You need to thoroughly treat three key positions: the entire bathroom floor, wall bases at least 30cm high, and especially the drain pipe collars – the most leak-prone areas. Use specialized waterproofing materials such as bitumen membrane, Sika, or polymer waterproof cement.

Ventilation and Lighting Systems

Bathrooms lacking ventilation are the main cause of mold, foul odors, and bacterial growth. If the space has natural windows, that’s best; otherwise, you must install an exhaust fan with appropriate capacity (minimum 15-20 air exchanges per hour). Bathroom design needs to calculate adequate lighting systems with switches and outlets placed in safe positions, away from water. Adequate lighting of about 200-300 lux helps make the space more open and easier to clean.

Choosing Safe and Durable Materials

Tile selection is a worthwhile investment in the bathroom renovation process. Floor tiles must have high slip resistance (R10 index or higher) to prevent slipping when wet, especially important for families with elderly and young children. Wall tiles should be glossy or semi-glossy for easy cleaning, water resistance, and reduced dirt adhesion. Avoid using excessively textured tiles on walls as they’re difficult to clean. Tile sizes of 30x60cm or 40x80cm provide fewer joints, reducing seepage risk and creating a more spacious feeling.

Standard Technical Floor Slope

A common mistake is making bathroom floors completely flat, leading to water pooling, poor drainage, and odors. The standard technical floor slope is 1-2% (meaning every 100cm length drops 1-2cm) toward the floor drain. The floor drain position should be at the lowest point, usually in the middle of the wet zone or against the wall. During construction, workers need to use a level to check the slope accurately, ensuring water flows quickly without pooling that causes slipping or odors.

Bathroom Feng Shui Elements Aligned with Destiny

The toilet should not face the main door directly, nor be aligned with the bed or altar. Bathroom mirrors are best placed on side walls, avoiding direct reflection toward the door. Regarding tile colors, you should choose according to the homeowner’s destiny: Wood destiny suits green and blue colors; Fire destiny suits red, orange, and pink; Earth destiny suits yellow and brown; Metal destiny suits white, gray, and silver; Water destiny suits black and deep blue. However, if you want a safe and easy-to-coordinate option, neutral tones like white, beige, and light gray are always suitable for all destinies and create a clean, spacious feeling.

Duc Khoi’s Latest 2026 Complete Bathroom Repair and Renovation Pricing Table

Below is the most detailed and comprehensive 2026 complete bathroom repair and renovation pricing table from us. We invite customers to review:

Demolition Work

No.ItemUnitPrice Range (VND)Notes
1Demolish old wall tiles50,000 – 80,000Including debris removal
2Demolish old floor tiles60,000 – 100,000Including debris removal
3Demolish plasterboard/plastic ceiling40,000 – 60,000
4Remove old toiletset150,000 – 250,000
5Remove washbasin + pedestal/cabinetset100,000 – 200,000
6Remove bathtubset300,000 – 500,000Depends on tub type
7Remove shower head/shower setset50,000 – 100,000
8Remove mirrorpiece50,000 – 80,000
9Remove mirror cabinetset80,000 – 150,000
10Remove ventilation fanpiece50,000 – 80,000
11Remove water heaterpiece100,000 – 200,000
12Remove washing machine (relocation)piece100,000 – 150,000
13Chase wall for water pipeslinear m40,000 – 60,000
14Chase wall for electrical wiringlinear m30,000 – 50,000
15Transport debris out of house250,000 – 400,000Depends on distance

Electrical System Work

No.ItemUnitPrice Range (VND)Notes
1Install concealed wiring (single wire)linear m25,000 – 40,000Wire not included
2Cadivi electrical wire 1.5mm²linear m8,000 – 12,000
3Cadivi electrical wire 2.5mm²linear m12,000 – 18,000
4Install waterproof electrical outletpiece80,000 – 150,000Outlet not included
5Install light switchpiece50,000 – 80,000Switch not included
6Install recessed LED lightset80,000 – 120,000Light not included
7Install bathroom heat lampset150,000 – 250,000Lamp not included
8Install ventilation fanpiece100,000 – 180,000Fan not included
9Install water heaterpiece200,000 – 350,000Heater not included
10Install solar water heaterset500,000 – 1,000,000System not included
11Install safety circuit breakerpiece100,000 – 150,000Breaker not included
12Connect bathroom electrical panelpoint150,000 – 250,000

Water Supply Work

No.ItemUnitPrice Range (VND)Notes
1Install PPR hot/cold water pipe Φ20linear m45,000 – 70,000Including pipe and fittings
2Install PPR hot/cold water pipe Φ25linear m55,000 – 85,000Including pipe and fittings
3Install Inox 304 water pipelinear m80,000 – 120,000Including pipe and fittings
4Install water shut-off valvepiece50,000 – 80,000Valve not included
5Install pressure reducing valvepiece80,000 – 120,000Valve not included
6Install auxiliary water meterpiece100,000 – 150,000Meter not included
7Install main water filterset150,000 – 250,000Filter not included
8Install washbasin water supply pointpoint100,000 – 150,000
9Install toilet water supply pointpoint80,000 – 120,000
10Install shower water supply pointpoint120,000 – 180,000
11Install washing machine water supply pointpoint100,000 – 150,000
12Install bathtub water supply pointpoint150,000 – 250,000

Drainage Work

No.ItemUnitPrice Range (VND)Notes
1Install PVC drain pipe Φ42linear m40,000 – 60,000Including pipe and fittings
2Install PVC drain pipe Φ60linear m50,000 – 75,000Including pipe and fittings
3Install PVC drain pipe Φ90linear m60,000 – 90,000Including pipe and fittings
4Install PVC drain pipe Φ114linear m80,000 – 120,000Including pipe and fittings
5Install stainless steel floor drainpiece80,000 – 120,000Drain not included
6Install strainer coverpiece50,000 – 80,000Cover not included
7Install vent pipelinear m60,000 – 100,000
8Clear minor drain blockagetime150,000 – 300,000
9Clear major drain blockage (machine)time300,000 – 600,000
10Replace main drain linelinear m150,000 – 250,000
11Install odor trap (P-trap/S-trap)piece100,000 – 150,000

Waterproofing Work

No.ItemUnitPrice Range (VND)Notes
1Waterproof floor Sika/Kova (2 layers)120,000 – 180,000Including materials
2Waterproof floor torch-on membrane (2 layers)180,000 – 280,000Including materials
3Waterproof wall (1m from floor)100,000 – 150,000Including materials
4Waterproof wall-floor cornerslinear m50,000 – 80,000
5Waterproof around floor-penetrating pipespoint80,000 – 120,000
6Waterproof pipe jointspoint50,000 – 80,000
7Water test waterproofing inspection (24h)time200,000 – 300,000
8Repair bathroom ceiling leaks150,000 – 250,000
9Negative-side waterproofing from below200,000 – 350,000Special method

Tile Installation Work

No.ItemUnitPrice Range (VND)Notes
1Install wall tiles 30x60cm180,000 – 250,000Tiles not included
2Install wall tiles 40x80cm200,000 – 280,000Tiles not included
3Install mosaic tiles280,000 – 400,000Tiles not included
4Install floor tiles 30x30cm150,000 – 200,000Tiles not included
5Install floor tiles 40x40cm160,000 – 220,000Tiles not included
6Install floor tiles 60x60cm180,000 – 250,000Tiles not included
7Install wood-look tiles200,000 – 280,000Tiles not included
8Tile grouting (joint sealant)30,000 – 50,000Including materials
9Create floor drainage slope50,000 – 80,000
10Install decorative trimlinear m80,000 – 120,000Trim not included
11Install natural stone350,000 – 550,000Stone not included

Plastering – Painting – Wall Finishing Work

No.ItemUnitPrice Range (VND)Notes
1Patch plastering after chasing80,000 – 120,000Including mortar
2Anti-moisture putty coating40,000 – 60,000Including materials
3Anti-alkali primer paint25,000 – 40,000Including paint
4Interior moisture-resistant paint (2 layers)45,000 – 70,000Including paint
5Epoxy waterproof paint120,000 – 180,000Including paint
6Treat wall mold/fungus60,000 – 100,000

Bathroom Ceiling Work

No.ItemUnitPrice Range (VND)Notes
1Install moisture-resistant plasterboard ceiling200,000 – 300,000Including materials and frame
2Install PVC plastic ceiling150,000 – 220,000Including materials and frame
3Install moisture-resistant aluminum ceiling280,000 – 400,000Including materials and frame
4Repair old ceiling (patching, painting)80,000 – 120,000
5Cut ceiling hole for light/fan installationhole50,000 – 80,000

Bathroom Door Work

No.ItemUnitPrice Range (VND)Notes
1Install aluminum-glass doorset300,000 – 500,000Door not included
2Install plastic door with steel coreset250,000 – 400,000Door not included
3Install water-resistant engineered wood doorset300,000 – 450,000Door not included
4Install glass shower partition150,000 – 250,000Glass not included
5Install glass shower enclosure (cabin)set500,000 – 800,000Enclosure not included
6Install shower curtainset100,000 – 150,000Curtain not included
7Replace door water seal/gasketlinear m30,000 – 50,000Including gasket
8Repair door hingespiece50,000 – 100,000
9Replace bathroom door lockset80,000 – 150,000Lock not included

Sanitary Equipment Installation Work

No.ItemUnitPrice Range (VND)Notes
1Install one-piece toiletset300,000 – 500,000Toilet not included
2Install two-piece toiletset250,000 – 400,000Toilet not included
3Install wall-hung toiletset500,000 – 800,000Toilet not included
4Install countertop washbasinset200,000 – 350,000Basin not included
5Install wall-hung washbasinset180,000 – 300,000Basin not included
6Install under-counter washbasinset250,000 – 400,000Basin not included
7Install pedestal sinkset200,000 – 350,000Sink not included
8Install washbasin cabinetset200,000 – 350,000Cabinet not included
9Install soaking bathtubset500,000 – 800,000Tub not included
10Install massage bathtubset800,000 – 1,500,000Tub not included
11Install shower cabinset600,000 – 1,000,000Cabin not included
12Install washbasin faucetpiece80,000 – 150,000Faucet not included
13Install shower headset100,000 – 180,000Shower not included
14Install standing shower columnset200,000 – 350,000Column not included
15Install concealed shower systemset300,000 – 500,000System not included
16Install bidet spraypiece80,000 – 120,000Spray not included
17Install wall-hung urinalset250,000 – 400,000Urinal not included

Bathroom Accessories and Fixtures Work

No.ItemUnitPrice Range (VND)Notes
1Install mirrorpiece80,000 – 150,000Mirror not included
2Install mirror cabinetset150,000 – 250,000Cabinet not included
3Install glass shelfpiece60,000 – 100,000Shelf not included
4Install towel rackpiece50,000 – 80,000Rack not included
5Install hookspiece30,000 – 50,000Hook not included
6Install toilet paper holderpiece50,000 – 80,000Holder not included
7Install soap dispenserpiece40,000 – 70,000Dispenser not included
8Install toothbrush cup holderpiece40,000 – 60,000Holder not included
9Install safety grab barpiece80,000 – 150,000Bar not included
10Install elderly shower seatpiece100,000 – 180,000Seat not included
11Install anti-slip matpiece30,000 – 50,000Mat not included
12Install hand dryerpiece150,000 – 250,000Dryer not included
13Install electric towel warmerpiece200,000 – 350,000Warmer not included

Repair and Maintenance Work

No.ItemUnitPrice Range (VND)Notes
1Repair leaking toilettime150,000 – 300,000
2Replace toilet flapperset100,000 – 200,000Including flapper
3Replace toilet flush mechanismset200,000 – 350,000Including mechanism
4Replace toilet seatpiece100,000 – 180,000Seat not included
5Repair leaking faucetpiece80,000 – 150,000
6Replace faucet washer/gasketpiece50,000 – 100,000Including washer
7Replace shower headpiece50,000 – 100,000Head not included
8Repair water heater (no part replacement)time150,000 – 300,000
9Clean water heatertime200,000 – 350,000
10Replace water heater anode rodpiece150,000 – 250,000Including rod
11Replace water heater heating elementpiece200,000 – 400,000Element not included
12Repair ventilation fanpiece80,000 – 150,000
13Repair bathroom heat lampset150,000 – 300,000
14Replace heat lamp bulbbulb80,000 – 150,000Bulb not included
15Treat bathroom odortime200,000 – 400,000
16Complete bathroom cleaning servicetime300,000 – 500,000

Notes:

  • Above prices exclude VAT (10%)
  • Prices may vary depending on actual site conditions
  • Main materials (tiles, sanitary equipment, accessories…) are calculated separately according to customer requirements
  • Warranty: Waterproofing 5 years, Electrical and plumbing 2 years, Equipment according to manufacturer
  • FREE site survey and detailed quotation
  • 24/7 consultation hotline: 0862.662.317

Duc Khoi’s Professional Complete Bathroom Renovation Process

To ensure construction quality and long-term durability, our bathroom renovation process follows proper technical standards. Specifically:

Quy trình cải tạo nhà vệ sinh

Step 1: Site Survey and Design Planning

Engineers measure space dimensions in detail, inspect current water supply and drainage systems, and assess wall and floor structural conditions. Then provide design consultation suitable for usage needs, budget, and homeowner’s feng shui elements. 2D-3D design drawings help you clearly visualize the space after completion and accurately determine sanitary equipment positions, tiles, and electrical/plumbing systems before construction.

Step 2: Remove Old Equipment and Demolition

Remove all old toilets, washbasins, shower heads, and sanitary equipment. Next, demolish old tiles, break down old cement mortar layers down to the original concrete base if complete renovation is needed. For apartment bathroom renovation, note appropriate construction hours (usually 8am-5pm on weekdays) and protect common areas to avoid disturbing neighbors.

Step 3: Reinstall Concealed Piping and Electrical Systems

Completely replace water supply lines and drainage pipes with high-quality PPR and PVC pipes. Concealed electrical systems are rearranged with properly standardized electrical wiring with protective conduits. Switch, outlet, and lighting positions are precisely located according to drawings.

Step 4: Absolute Waterproofing Treatment

The bathroom waterproofing layer is applied in 2-3 layers using specialized materials (Sika, polymer bitumen, or waterproofing membrane). Thoroughly treat wall corners, pipe collars, and joints – the most leak-prone areas. After completion, conduct a water ponding test for at least 48-72 hours to check watertightness.

Step 5: Floor Leveling with Drainage Slope and Tile Installation

Level cement floor creating a standard 1-2% slope toward the floor drain so water drains quickly without pooling. After the floor dries, proceed with tile installation according to design drawings. Anti-slip floor tiles are installed first, then wall tiles from bottom to top. Mortar joints must be even, aligned, and tight to ensure both aesthetics and waterproofing capability.

Step 6: Install Sanitary Equipment and Finishing

Install all sanitary equipment in designed positions: toilet, washbasin, shower, bathtub (if any), mirror, washbasin cabinet. Electrical and plumbing systems are connected and tested for operation. Install exhaust fan, lighting, bathroom accessories such as towel racks, hooks, and paper holders.

Step 7: Professional Cleaning and Handover

Clean all dust, cement residue, and remaining mortar on tiles and equipment. Professional deep cleaning makes surfaces shiny and tile joints clean. Finally, hand over the project to homeowners with usage instructions, renovation warranty, and quality commitment. Average renovation time for a 3-5m² bathroom is 5-7 days, depending on design complexity.

Common Costly Mistakes in Bathroom Renovation

Many families have to spend tens of millions of VND extra due to regrettable mistakes during renovation. Below are common errors you should avoid.

Những sai lầm thường gặp

Buying Sanitary Equipment Before Re-measuring Area

Not few cases where homeowners purchase toilets, washbasins, and shower heads before rough work is completed. After tile installation, actual area shrinks by about 8-12cm compared to initially due to tile and mortar thickness. The result is sanitary equipment doesn’t fit properly, requiring returns or position adjustments causing waste.

Saving Money on Waterproofing – Regret Forever

This is the most costly mistake many people make. Some families choose cheap, low-quality waterproofing materials or only apply 1 layer instead of 2-3 layers per technical standards. The consequence is after 1-2 years of use, the bathroom leaks, water flows to the floor below, walls become moldy.

Overlooking Concealed Electrical System When Adding Equipment

Many families don’t plan ahead for installing additional water heaters, hand dryers, high-end exhaust fans when designing bathrooms. When wanting to add these equipment after completion, they must run exposed wiring that ruins aesthetics and poses electrical hazards in damp environments.

Outstanding Advantages When Using Duc Khoi’s Complete Bathroom Renovation Service in Hanoi

With over 12 years of experience in design – construction – home repair, Duc Khoi proudly provides the most professional and reputable bathroom renovation service in Hanoi.

Công ty sửa chữa nhà trọn gói

Skilled Workers, Standard Technical Construction

Duc Khoi possesses an experienced team of workers systematically trained in home renovation processes. Each project has an engineer directly supervising, ensuring every small detail like waterproofing, floor slope, and sanitary equipment installation meets standards.

Transparent Quotation, No Hidden Costs

Before starting work, Duc Khoi provides detailed quotations for each work item and material. Clear pricing helps you proactively control budget, avoiding sudden cost increases. We commit to the most competitive prices in Hanoi market with superior construction quality.

Free Design Consultation, Space Optimization

Duc Khoi’s architect team provides free design consultation, helping you optimize area even in small spaces. We combine modern aesthetics with destiny-aligned bathroom feng shui, ensuring the most convenient functional use.

Genuine Materials, Lifetime Waterproofing

Duc Khoi only uses materials from reputable brands: Dong Tam, Prime tiles; TOTO, American Standard, Inax sanitary equipment; Sika, Soprema waterproofing materials. Especially, we commit to absolute waterproofing with standard 3-layer technical process, 72-hour water testing before tile installation. All materials have anti-counterfeit stamps and clear origins.

Transparent Legal Permits and Procedures

Duc Khoi supports consultation and construction permit processing (if necessary) for major renovation projects. Bathroom renovation contracts are fully signed, clearly stating rights and responsibilities of both parties. All transactions have VAT invoices, ensuring customer rights according to legal regulations.

Cleaning and Clean Site Return

After completing bathroom construction, Duc Khoi’s team performs professional cleaning of the entire area. We clean up dust, debris, polish tiles to a shine, and hand over the project in “move-in ready” condition.

Conclusion

Above is Duc Khoi’s sharing about bathroom renovation. We hope this article helps you find the information you need. If you need our support, please call our Hotline: 0862 662 317 for the best consultation. Best regards!